Plants / Water Treatment Unit / Operator training
Operator training
A training simulator on the plant's own drawing. Click pumps to start or stop them, and control valves to set them. One second here is one minute in the plant.
Feed into SF-3201 jumps 50% two minutes in. Keep the level between 15% and 85% for 30 minutes.
0 / 30 min
Click a pump to start or stop it. Click a valve (yellow) to set how far open it is.
Alarms
None
0m Started: Feed upset
Training records
No runs yet.