TK-2501

Condensate and feed water tank
Storage tank
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A A B B C C D D E E F F NOTES 1. Boiler burner management system is a vendor PLC. Flame loss BSL-2501 closes the gas valve XV-2524. 2. Steam is let down from 10 barg to 3.5 barg by PV-2500. 3. Recovered water from the peroxide column joins the condensate return. INSTRUMENT SYMBOLS Field mounted Control system (DCS), operator can see it Electric signal Main process line Utility / secondary line ENTHRA LABS DEMO DRAWING SUGAR TO HYDROGEN PEROXIDE PIPING AND INSTRUMENT DIAGRAM: STEAM AND CONDENSATE DRAWING NO. PID-2501 SHEET / REV 15 OF 15 REV 0 SCALE: NONE DATE: 2026-11-24 FICTIONAL PLANT FOR DEMONSTRATION. NOT FOR CONSTRUCTION. B-2501 PACKAGE STEAM BOILER H-2501 LOW PRESSURE STEAM HEADER H-2502 CONDENSATE RETURN HEADER TK-2501 CONDENSATE AND FEED WATER TANK P-2501 BOILER FEED PUMP PV-2500 8"-MS-2500-C10 PID-1201 TO E-1201 2"-LS-1201-C10 PID-1801 TO EV-1801 3"-LS-2502-C10 PID-1901 TO E-1902 3"-LS-2503-C10 PID-2101 TO E-2101 2"-LS-2504-C10 PID-2201 TO EV-2201 3"-LS-2505-C10 PID-2301 TO E-2301 2"-LS-2506-C10 PID-1201 FROM E-1201 1"-SC-1201-C10 PID-1801 FROM EV-1801 2"-SC-2512-C10 PID-1901 FROM E-1902 2"-SC-2513-C10 PID-2101 FROM E-2101 1"-SC-2514-C10 PID-2201 FROM EV-2201 2"-SC-2515-C10 PID-2301 FROM E-2301 1"-SC-2516-C10 PID-1901 FROM P-1901 2"-PW-1905-S10 4"-SC-2520-C10 B/L DEMIN WATER LV-2521 2"-DW-2521-S10 3"-SC-2522-S10 FV-2523 2"-SC-2523-S10 B/L NATURAL GAS S XV-2524 6"-PG-2524-C10 ATM PSV-2501 SET 11 barg PT 2500 PIC 2500 3.5 barg LT 2501 LIC 2501 LT 2502 LIC 2502 BSL 2501
Design and operating data
Capacity25 m3
MaterialSS316L
Design temp110 C
Design pressureATM
Notes
History
No changes recorded.