Sugar to Hydrogen Peroxide / PID-1101 Sugar receiving and storage
SVG
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A A B B C C D D E E F F NOTES 1. Storage tanks and syrup lines are heat traced and insulated to keep syrup at 50 to 60 C. 2. One transfer pump runs, one is the installed spare. 3. Tank vents go through a breather valve, not shown. INSTRUMENT SYMBOLS Field mounted Control system (DCS), operator can see it Electric signal Main process line Utility / secondary line ENTHRA LABS DEMO DRAWING SUGAR TO HYDROGEN PEROXIDE PIPING AND INSTRUMENT DIAGRAM: SUGAR RECEIVING AND STORAGE DRAWING NO. PID-1101 SHEET / REV 1 OF 15 REV 0 SCALE: NONE DATE: 2026-11-24 FICTIONAL PLANT FOR DEMONSTRATION. NOT FOR CONSTRUCTION. TK-1101 DEXTROSE SYRUP STORAGE TANK A TK-1102 DEXTROSE SYRUP STORAGE TANK B P-1101A SYRUP TRANSFER PUMP P-1101B SYRUP TRANSFER PUMP (SPARE) B/L TRUCK UNLOADING 4"-PR-1101-S10 B/L TRUCK UNLOADING 4"-PR-1102-S10 4"-PR-1103-S10 4"-PR-1104-S10 PID-1201 TO TK-1201 3"-PR-1105-S10 PID-1201 TO TK-1201 3"-PR-1106-S10 LT 1101 0-12 m LI 1101 TT 1101 0-100 C LT 1102 0-12 m LI 1102 PI 1101 PI 1102
Scroll to zoom · drag to move · click anything to inspect