Sugar to Hydrogen Peroxide
/
PID-1101
Sugar receiving and storage
100%
SVG
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
A
A
B
B
C
C
D
D
E
E
F
F
NOTES
1. Storage tanks and syrup lines are heat traced and
insulated to keep syrup at 50 to 60 C.
2. One transfer pump runs, one is the installed spare.
3. Tank vents go through a breather valve, not shown.
INSTRUMENT SYMBOLS
Field mounted
Control system (DCS), operator can see it
Electric signal
Main process line
Utility / secondary line
ENTHRA LABS
DEMO DRAWING
SUGAR TO HYDROGEN PEROXIDE
PIPING AND INSTRUMENT DIAGRAM: SUGAR RECEIVING AND
STORAGE
DRAWING NO.
PID-1101
SHEET / REV
1 OF 15 REV 0
SCALE: NONE
DATE: 2026-11-24
FICTIONAL PLANT FOR DEMONSTRATION.
NOT FOR CONSTRUCTION.
TK-1101
DEXTROSE SYRUP STORAGE
TANK A
TK-1102
DEXTROSE SYRUP STORAGE
TANK B
P-1101A
SYRUP TRANSFER PUMP
P-1101B
SYRUP TRANSFER PUMP
(SPARE)
B/L
TRUCK UNLOADING
4"-PR-1101-S10
B/L
TRUCK UNLOADING
4"-PR-1102-S10
4"-PR-1103-S10
4"-PR-1104-S10
PID-1201
TO TK-1201
3"-PR-1105-S10
PID-1201
TO TK-1201
3"-PR-1106-S10
LT
1101
0-12 m
LI
1101
TT
1101
0-100 C
LT
1102
0-12 m
LI
1102
PI
1101
PI
1102