Sugar to Hydrogen Peroxide / PID-2401 Cooling water system
SVG
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A A B B C C D D E E F F NOTES 1. Supply 28 C, return about 38 C at full load. 2. Spare pump starts on low header pressure (auto start logic in the control system). 3. Chemical treatment skid for the tower is a vendor package, not shown. INSTRUMENT SYMBOLS Field mounted Control system (DCS), operator can see it Electric signal Main process line Utility / secondary line ENTHRA LABS DEMO DRAWING SUGAR TO HYDROGEN PEROXIDE PIPING AND INSTRUMENT DIAGRAM: COOLING WATER SYSTEM DRAWING NO. PID-2401 SHEET / REV 14 OF 15 REV 0 SCALE: NONE DATE: 2026-11-24 FICTIONAL PLANT FOR DEMONSTRATION. NOT FOR CONSTRUCTION. CT-2401 COOLING TOWER P-2401A COOLING WATER PUMP P-2401B COOLING WATER PUMP (SPARE) H-2401 COOLING WATER SUPPLY HEADER H-2402 COOLING WATER RETURN HEADER 20"-CWS-2420-C10 20"-CWS-2421-C10 20"-CWS-2422-C10 20"-CWS-2423-C10 PID-1501 TO R-1501 4"-CWS-2401-C10 PID-1501 TO E-1501 2"-CWS-2402-C10 PID-1601 TO R-1601 4"-CWS-2403-C10 PID-1601 TO E-1601 2"-CWS-2404-C10 PID-1801 TO E-1802 8"-CWS-2405-C10 PID-1401 TO E-1401 6"-CWS-2406-C10 PID-1901 TO E-1901 6"-CWS-2407-C10 PID-2101 TO E-2102 3"-CWS-2408-C10 PID-2201 TO CR-2201 3"-CWS-2409-C10 PID-1501 FROM R-1501 4"-CWR-2411-C10 PID-1501 FROM E-1501 2"-CWR-2412-C10 PID-1601 FROM R-1601 4"-CWR-2413-C10 PID-1601 FROM E-1601 2"-CWR-2414-C10 PID-1801 FROM E-1802 8"-CWR-2415-C10 PID-1401 FROM E-1401 6"-CWR-2416-C10 PID-1901 FROM E-1901 6"-CWR-2417-C10 PID-2101 FROM E-2102 3"-CWR-2418-C10 PID-2201 FROM CR-2201 3"-CWR-2419-C10 20"-CWR-2424-C10 B/L RAW WATER LV-2425 4"-RW-2425-C10 B/L WASTEWATER TREATMENT AV-2426 2"-WW-2426-C10 LT 2401 LIC 2401 AT 2401 0-3000 uS/cm AIC 2401 TT 2401 0-50 C PT 2401 PI 2401 TT 2402
Scroll to zoom · drag to move · click anything to inspect