Plants / Sugar to Hydrogen Peroxide / Operator training
Operator training
A training simulator on the plant's own drawing. Click pumps to start or stop them, and control valves to set them. One second here is one minute in the plant.
P-1501 stops two minutes in. Keep R-1501 below 85% full for 30 minutes.
0 / 30 min
Click a pump to start or stop it. Click a valve (yellow) to set how far open it is.
Alarms
None
0m Started: P-1501 trips
Training records
No runs yet.