Safety Studio

Prepares the HAZOP from the drawings and checks the relief valves. It saves prep time; the team still runs the review and signs off every row. Legal responsibility for safety stays with the plant.

HAZOP ExcelCSV
E-1201 feed heater
PID-1201 · · feed about 24.5 m3/h (quick simulation)
No flowDraft
Causes
  • P-1201 stops
  • TV-1204 fails closed
  • Hand valve on the inlet left closed
Consequences
  • Downstream of E-1201 runs short of feed
  • Quick simulation, P-1201 stopped: 40 lines change flow
Safeguards
None on the drawings
Action
  • Consider a low flow or low level alarm on E-1201
More flowDraft
Causes
  • TV-1204 fails open
Consequences
  • E-1201 cannot keep up (outlet off temperature)
  • Downstream equipment overloaded
Safeguards
None on the drawings
Action
None
Reverse flowDraft
Causes
  • P-1201 stops while E-1201 is under pressure
Consequences
  • Back-flow from E-1201 through the stopped pump
Safeguards
  • Check valve on the pump discharge
Action
None
High temperatureDraft
Causes
  • Steam control valve fails open
Consequences
  • E-1201 outlet too hot
  • Heat-sensitive product damaged
Safeguards
None on the drawings
Action
  • Add a high temperature alarm on E-1201
High pressureDraft
Causes
  • Outlet blocked (valve closed)
  • Pump pushing against a closed outlet (4.9 bar at shut-off)
  • External fire
Consequences
  • E-1201 over its design pressure (not given)
Safeguards
None on the drawings
Action
  • Check whether E-1201 needs a relief valve