Safety Studio

Prepares the HAZOP from the drawings and checks the relief valves. It saves prep time; the team still runs the review and signs off every row. Legal responsibility for safety stays with the plant.

HAZOP ExcelCSV
E-1902 reboiler
PID-1901 · · feed about 74.6 m3/h (quick simulation)
No flowDraft
Causes
  • TV-1902 fails closed
  • Hand valve on the inlet left closed
Consequences
  • Downstream of E-1902 runs short of feed
Safeguards
None on the drawings
Action
  • Consider a low flow or low level alarm on E-1902
More flowDraft
Causes
  • TV-1902 fails open
Consequences
  • E-1902 cannot keep up (outlet off temperature)
  • Downstream equipment overloaded
Safeguards
None on the drawings
Action
None
High temperatureDraft
Causes
  • Steam control valve fails open
Consequences
  • E-1902 outlet too hot
  • Heat-sensitive product damaged
Safeguards
  • Temperature control TT-1902, TIC-1902
Action
None
High pressureDraft
Causes
  • Outlet blocked (valve closed)
  • External fire
Consequences
  • E-1902 over its design pressure (not given)
Safeguards
None on the drawings
Action
  • Check whether E-1902 needs a relief valve