R-2101 catalytic oxidation reactor
PID-2101 · design temp 120 C · operating temp 70 C · design pressure 10 barg · operating pressure 5 barg · feed about 14.6 m3/h (quick simulation)
No flowDraft
Causes
  • FV-2104 fails closed
  • Hand valve on the inlet left closed
Consequences
  • Downstream of R-2101 runs short of feed
Safeguards
  • Flow control FT-2104, FIC-2104
Action
None
More flowDraft
Causes
  • FV-2104 fails open
Consequences
  • R-2101 overfills
  • Downstream equipment overloaded
Safeguards
  • Flow control FT-2104, FIC-2104
Action
None
High levelDraft
Causes
  • Outlet pump stops
Consequences
  • R-2101 overflows or liquid goes into the vent
  • Spill of process liquid
Safeguards
  • Relief PSV-2101
Action
  • No level measurement on R-2101: add a level transmitter with high alarm
Low levelDraft
Causes
  • Feed stops
Consequences
  • Outlet pump runs dry and is damaged
Safeguards
None on the drawings
Action
  • Add a low level trip to protect the outlet pump of R-2101
High pressureDraft
Causes
  • Outlet blocked (valve closed)
  • External fire
Consequences
  • R-2101 pressure rises
Safeguards
  • Relief PSV-2101 set 10 barg
  • Pressure control PDT-2101