Safety Studio

Prepares the HAZOP from the drawings and checks the relief valves. It saves prep time; the team still runs the review and signs off every row. Legal responsibility for safety stays with the plant.

HAZOP ExcelCSV
TK-1302 caustic day tank
PID-1301 · design temp 50 C · design pressure ATM · feed about 0.2 m3/h (quick simulation)
No flowDraft
Causes
  • Hand valve on the inlet left closed
Consequences
  • Downstream of TK-1302 runs short of feed
  • Pumps further on can run dry
Safeguards
  • Level indication LT-1302, LI-1302
Action
None
More flowDraft
Causes
  • Upstream pump running faster than normal
Consequences
  • TK-1302 overfills
  • Downstream equipment overloaded
Safeguards
  • Level control LT-1302, LI-1302
Action
None
High levelDraft
Causes
  • HV-130108 left closed
  • Outlet pump stops
Consequences
  • TK-1302 overflows or liquid goes into the vent
  • Spill of sodium hydroxide, 25 wt%
Safeguards
  • Level LT-1302, LI-1302
Action
None
Low levelDraft
Causes
  • Feed stops
Consequences
  • Outlet pump runs dry and is damaged
Safeguards
  • Level LT-1302, LI-1302
Action
None
High pressureDraft
Causes
  • Outlet blocked (valve closed)
  • External fire
Consequences
  • TK-1302 over its design pressure (ATM)
Safeguards
None on the drawings
Action
None