Safety Studio

Prepares the HAZOP from the drawings and checks the relief valves. It saves prep time; the team still runs the review and signs off every row. Legal responsibility for safety stays with the plant.

HAZOP ExcelCSV
TK-2002 peroxide storage tank b
PID-2001 · design temp 40 C · design pressure ATM · feed about 5 m3/h (quick simulation)
No flowDraft
Causes
  • Hand valve on the inlet left closed
Consequences
  • Downstream of TK-2002 runs short of feed
  • Pumps further on can run dry
Safeguards
  • Level indication LT-2002, LAH-2002
Action
None
More flowDraft
Causes
  • Upstream pump running faster than normal
Consequences
  • TK-2002 overfills
  • Downstream equipment overloaded
Safeguards
  • Level control LT-2002, LAH-2002
Action
None
High levelDraft
Causes
  • HV-200104 left closed
  • Outlet pump stops
Consequences
  • TK-2002 overflows or liquid goes into the vent
  • Spill of hydrogen peroxide 50 wt%
Safeguards
  • Level LT-2002, LAH-2002
  • Relief PSV-2002
Action
None
Low levelDraft
Causes
  • Feed stops
Consequences
  • Outlet pump runs dry and is damaged
Safeguards
  • Level LT-2002, LAH-2002
Action
None
High pressureDraft
Causes
  • Outlet blocked (valve closed)
  • External fire
Consequences
  • TK-2002 pressure rises
Safeguards
  • Relief PSV-2002 set 0.05 barg
Action
None