TK-2501 condensate and feed water tank
PID-2501 · design temp 110 C · design pressure ATM · feed about 29.8 m3/h (quick simulation)
No flowDraft
Causes
  • LV-2521 fails closed
  • Hand valve on the inlet left closed
Consequences
  • Downstream of TK-2501 runs short of feed
Safeguards
  • Level indication LT-2501, LIC-2501
Action
None
More flowDraft
Causes
  • LV-2521 fails open
Consequences
  • TK-2501 overfills
  • Downstream equipment overloaded
Safeguards
  • Level control LT-2501, LIC-2501
Action
None
High levelDraft
Causes
  • Outlet pump stops
Consequences
  • TK-2501 overflows or liquid goes into the vent
  • Spill of process liquid
Safeguards
  • Level LT-2501, LIC-2501
Action
None
Low levelDraft
Causes
  • Feed stops
Consequences
  • Outlet pump runs dry and is damaged
Safeguards
  • Level LT-2501, LIC-2501
Action
None
High pressureDraft
Causes
  • Outlet blocked (valve closed)
  • External fire
Consequences
  • TK-2501 over its design pressure (ATM)
Safeguards
None on the drawings
Action
None